Changes

6 bytes removed ,  13:22, 13 September 2009
Fixed link to the spec
Line 1: Line 1:  
'''Part 1''' of the [[MeeshQuest]] project:
 
'''Part 1''' of the [[MeeshQuest]] project:
 
* Due Date: Friday, September 30 + 24 hour grace period + ε
 
* Due Date: Friday, September 30 + 24 hour grace period + ε
* The official spec is [http://www.cs.umd.edu/~meesh/cmsc420/part1/p12/ here]. Current version: Final 1.2
+
* The official spec is [http://www.cs.umd.edu/~meesh/cmsc420/p10/ here]. Current version: Draft 1.0
 
* Spec errata: [[Spec 1.1 Errata]] (errata left out of 1.2 spec still apply)
 
* Spec errata: [[Spec 1.1 Errata]] (errata left out of 1.2 spec still apply)
 
* As always, the spec will freeze 1 week prior to the due date.
 
* As always, the spec will freeze 1 week prior to the due date.
2

edits