Changes

91 bytes added ,  14:31, 7 June 2010
no edit summary
Line 1: Line 1:  
'''Part 1''' of the [[MeeshQuest]] project:
 
'''Part 1''' of the [[MeeshQuest]] project:
 
* Due Date: Friday, September 30 + 24 hour grace period + ε
 
* Due Date: Friday, September 30 + 24 hour grace period + ε
* The official spec is [http://www.cs.umd.edu/~meesh/cmsc420/p10/ here]. Current version: Draft 1.0
+
* All part 1 files can be found [http://www.cs.umd.edu/users/meesh/420/part1/ here]
 +
* The official spec is [http://www.cs.umd.edu/users/meesh/420/part1/p12/ here]. Current version: Draft 1.2
 
* Spec errata: [[Spec 1.1 Errata]] (errata left out of 1.2 spec still apply)
 
* Spec errata: [[Spec 1.1 Errata]] (errata left out of 1.2 spec still apply)
 
* As always, the spec will freeze 1 week prior to the due date.
 
* As always, the spec will freeze 1 week prior to the due date.
12

edits